Songa Energy is developing several sites in Burundi, all located in the central/southern part of the country – in Gitega and Bururi Provinces. These sites range in size from 500KW to 8MW (8000KW), and we will shortly begin feasibility studies to evaluate the hydrology (past, current, and expected future river flow rates), topography, social and environmental factors, and the economics related to expected expenses and income for each site. We will begin our assessment with the Ruvyi102 site on the Ruvyironza River, which is also the southern most tributary of the Nile River. This site is expected to produce about 1000-1500KW of electricity.