Songa Energy develops, builds, owns and operates two grid-connected hydropower plants in south-central Burundi on the Upper Ruvyironza River (1.65 MW) and the Upper Mulembwe River (9.0 MW). Construction began on the hydropower plants in 2023, with the first power to be delivered onto the Burundi national grid by the end of 2024.

Songa Energy is developing several sites in Burundi, all located in the central/southern part of Read more

Contact Us

E-mail: info@virungapower.com
Address: Old East Building
Place de l’Indépendance
Bujumbura, Burundi