Songa Energy develops, builds, owns and operates two grid-connected hydropower plants in south-central Burundi on the Upper Ruvyironza River (1.65 MW) and the Upper Mulembwe River (9.0 MW). Construction began on the hydropower plants in 2023, with the first power to be delivered onto the Burundi national grid by the end of 2024.

Songa Energy has completed construction of the vocational training school at the site of our Read more
In preparation for inauguration activities at our Ruvyi102 site, we have prepared video showing the Read more
Songa Energy at East Africa Power Industry Conference
Songa Energy participated as a member of the Burundi delegation to the EAPIC conference on Read more
On 29 July 2016 the 2nd Vice President of Burundi, Dr. Joseph Butore, participated in Read more

Contact Us

E-mail: info@virungapower.com
Address: Old East Building
Place de l’Indépendance
Bujumbura, Burundi